Use and Care Guide

16
Using a rubber mallet, tap along the drop
click prole with medium force to secure a
tight seam.
Place the tapping block along the open
click prole of the short edge and tap over
it with a rubber mallet. This ensures a tight
install.
4
5
Installing the Flooring (Tiles / Planks)
Make sure the edges are aligned perfectly.
Place the tapping block on the open click
prole of the long edge and tap over it
with a rubber mallet to align the tiles.
Follow steps 1 to 7 for remaining row of
tiles. Measure the space left for the last tile
using a tape measure.
76
8 9
Cut the tile to required length. Refer to
the page 7 for “Recommended Cutting
Method . Note: Ensure there is proper
clearance from the wall based on your
preferred installation.