Operating Guide

21
9.5mm NewAge
Flooring
Floor
9.5mm NewAge
Flooring
Floor
Lay the tiles on the wide edge of connection base connecting the two ooring at dierent
heights.
Press the reducer down to ensure that one side is resting on the newly Installed NewAge
Flooring and the other side is on your pre-installed oors of dierent height. This ensures the
reducer is properly seated in the base.
5
4
Installing Multi-Purpose Reducer
Note: Wipe o the excessive adhesive at the corners with a clean cloth.