Operating Guide

9
NewAge Stone Composite Flooring is suitable to be installed over radiant heating systems as
long as the heating element is not in direct contact with the ooring. Leave at least 1/2” gap
between the Floors and radiant heat systems.
If the radiant heating has been newly installed, leave the system on and operational for at
least 2 weeks prior to installation. This would reduce the moisture levels in the concrete.
Turn o the heating system for 24 hrs before and after installing NewAge Stone Composite
Flooring.
It is recommended for the desired room to be 5°C (41°F) to 24°C (75.2°F) prior to installation.
You may need to use other heating methods prior to install.
Radiant heating
General Suboor Preparation
Test the moisture content of wood suboor using a moisture meter. It should not exceed
12%.
Sand or plane high spots and ll all holes and gaps.
Wood suboors
Suspended wood suboors should have at least 18 inches of well-ventilated crawl space
underneath.
NewAge Stone Composite Flooring can be installed over many wood substrates as long as
the surface is smooth, at and structurally sound.
Repair any squeaky oors before installing NewAge Stone Luxury Flooring.
Note: Due to the use of power and manual tools during installation, damage may occur to the
wood suboors.