•  If there are pre-installed baseboards in need of replacement, remove old baseboards and 
quarter rounds. 
•  If new baseboards and quarter rounds need to be installed, install these items after the oors 
have been completed.
•  Chisel any uneven surfaces on the oor and wall before starting the install. 
•  Ensure the general space preparation has been completed before starting install. Reference 
page 8. 
•  Ensure Concrete suboor, Radiant heating or wood suboor requirements has been followed. 
Reference page 8-9.
•  NewAge Stone Composite ooring can not be installed with pre-installed quarter rounds. All 
Quarter rounds need to be removed before starting install.
•  Once all quarter rounds have been removed, cut approximately 11mm o the bottom of your 
baseboards to have enough space for the 9.5mm oor planks or tiles. 
•  Note: If previous oors are thicker than the new Luxury Vinyl Floors, you may need to 
purchase a new door casing or plinth block. 
•  Quarter rounds will need to be installed after the ooring is complete. 
•  Ensure the general space preparation has been completed before starting install. Reference 
page 8. 
•  Ensure Concrete suboor, Radiant heating or Wood Suboor requirements has been followed.  
Reference page 8-9. 
Option 1: Installing Interior ooring before baseboards and quarter rounds. 
Option 2: Installing Interior ooring with pre-installed baseboards and 
quarter rounds. 
Baseboard and Quarter Round Preparation 