How to Guide

14
6
iv
iv
iii
i
i
ii
iii
Mark next location for pilot hole using the wall mounting bracket (#6) and rear perimeter beam
(#2). Follow steps i through iii below.
Insert the Wall
Mounting Bracket and
Carriage Bolt onto the
Rear Perimeter Beam.
Mark the wall location to be drilled along the center of the stud (as shown above).
Mount the Rear
Perimeter Beam
onto the previously
installed Wall
Mounting Bracket.
Align the bracket with
the level line drawn
from step 2.
Note: Do not install nut onto carriage bolts until step 15.
Note: If the spacing of your studs do not align with the install locations refer to installing wall brace
on Page.25
ii
Drill a 3/16” pilot hole & secure wall mounting bracket into stud using one 3” Lag Screw (#17)
one 1/4” washer (#9) and a 7/16” socket. Ensure Carriage Bolt (#8) is mounted before installing
bracket.
Repeat steps 6 & 7 for opposite side, or connecting multiple wall mounted shelves horizontally.
Bolt the center of the rear perimeter beams to the wall mounting bracket with two 1/4” washers
(#9) and two 1/4” acorn nuts (#10).
7
8
Note:
To continue Wall Installation continue to page 15. To Continue Ceiling installation, skip to page 17.