Installation Guide

13
Warning:
Make sure the Lag Screws
are tight against the stud
but DO NOT over-tighten
the lag screws.
If lag screws are over-
tightened, the lag screw
could snap or the hole
may be stripped.
Installing Wall Brackets & Back Beam
Masonry
Follow steps 1 to 11.
Drill pilot holes through the marked locations with hammer drill & 5/16” masonry bit.
Use Concrete Anchor for each pilot hole.
i
Align the bottom of the Wall Mounting
Bracket (#12) with the bottom level line
and the center of the wall stud with
the center of the horizontal slot in the
mounting bracket (mark the hole to be
drilled)
Drill a pilot hole using a 3/16” drill bit.
Note: Pilot hole must bore into 3 inches
of solid wood for lag screw to be fully
secured.
3
4
Insert one carriage bolt (#13) into the square opening that aligns with the wall stud.
Secure wall mounting bracket to stud using one 3in Lag Screw (#15), one 1/4” washer
(#8) and 7/16” socket. Note: If connecting 2 or more Wall Mounted Shelves horizontally,
refer to pg 26 before installing bracket.
5
i