How to Guide

7
www.newageproducts.com
Hanging Slatwall Backsplash on Studded Wall
Installing Backsplash for Fixed Cabinets
Place xed bottom strip tight
against the wall and the top of the
worktop. If your cabinet set does
not have lower cabinets with a
worktop proceed to page 9
Interlock bottom of Slatwall section
with the top of xed bottom strip.
Repeat step 5 to securely fasten
“Slatwall Section.
Interlock Top Magnet Cover on top
of the slatwall section and secure
in position with magnets.
Pre-drill 3mm (1/8”) holes into each
stud then fasten slatwall section to
each wood stud with screws provided.
Repeat steps 5 & 6 for remaining
slatwall sections.
Masonry.
4
5
76
8
Follow steps 4 to 8.
Drill pilot holes through the perforated
strip each 16in with hammer drill &
masonry bit.
Use 2¼” x ¼” Tapcon Concrete Anchor
for each pilot hole. (Not Included)
OR use #10 x 2” Screw with ⁄” masonry
plug for each pilot hole. (Not Included)