Installation Guide
13
D
E
Mark three holes of the back bottom beam equidistantly. Make sure the marked holes will be
hitting a stud. Once the holes have been marked, drill pilot holes using a 3/16” drill bit on the
studded wall. Pilot hole must bore into 3 inches of solid wood for lag screw to be fully secured.
Secure the bottom beam to the wall with a tapping screw and a washer.
Assembling The Rack (Contd.)
17
18
D
E