Installation Guide

Parts Supplied
Unpacking
• Begin by placing the package on a protected  at surface.
• Remove all cardboard, foam packaging material and clear plastic bags.
• Dispose / recycle all packaging materials.
Verify all the contents in the box and gather the required tools. See “Parts” and Tools Needed” in the list below.
4 x Height-Adjustable
Aluminium Leveling Legs
16 x Hex Bolts
(M6 x 25mm)
Height-Adjustable Aluminum Legs
Leg Adjustment Wrench
4
4
4
1
Hex Washer Bolt (M6 x 25mm)
Hex Bolt ( M5 x 50mm)
16
3 Drawer
Cabinet
Hex Nuts (M5)
4 x Hex Bolts
(M5 x 50mm)
4 x Hex Nuts