Installation Guide
3
Parts Supplied
Unpacking
• Begin by placing the package on a protected at surface.
• Remove all cardboard, foam packaging material and clear plastic bags.
• Dispose / recycle all packaging materials.
• Verify all the contents in the box and gather the required tools. See “Parts” and “Tools Needed” in the list below.
4 x Height-Adjustable
Aluminium Leveling Legs
Height-Adjustable Aluminum Legs
Leg Adjustment Wrench
4
4
1
Hex Bolt ( M6 x 25mm)
4
16
BBQ
Cabinet
Hex Nuts (M5)
Hex Bolt (M5 x 50mm)
4 X Hex Bolts
(M6 x 25mm)
Leg Height
Wrench
4 X Hex Bolt
(M5 x 50mm”)
4 X Hex Nuts
(M5)