Installation Guide

3
Parts Supplied
Unpacking
• Begin by placing the package on a protected  at surface.
• Remove all cardboard, foam packaging material and clear plastic bags.
• Dispose / recycle all packaging materials.
Verify all the contents in the box and gather the required tools. See “Parts” and Tools Needed” in the list below.
3 x Height-Adjustable
Legs
12 x Hex Bolts
(M6 x 25mm))
Height-Adjustable Aluminum Legs
Leg Adjustment Wrench
3
4
1
Hex Bolt (M6 x25mm)
Hex Bolt ( M5 x 50mm)
12
45˚
Cabinet
4 x Hex Bolts
(M5 x 50mm)
Leg Wrench