Instructions / Assembly
Table Of Contents
- IM-HKC.01A-01 REV 1.1_Home Cabinets Installation Guide
- Unpacking
- Product Inspection
- Home Cabinets and Accessories
- Tools Needed
- Hardware
- Room Preparation
- Installation Layout Options
- Installation Overview
- Removal and Installation of Doors
- Removal and Installation of Drawers
- Installation of Drawer Front Panels
- Installation of Drawer Front Panels
- Adjusting the Wood Shelves
- Installation of Glass Shelves on Wall Cabinets with Glass Doors
- Installation of Feet for Base Cabinets
- Corner Layout Installation
- Wall Rail Installation for Wall Cabinets
- Wall Cabinets Installation
- Installing the Linear layout
- Installing the Island layout
- Installing the U shaped layout
- Additional Accessories offered by NewAge
- SPARE PARTS - BASE CABINET with DOORS
- SPARE PARTS - BLIND CORNER
- SPARE PARTS - 3 DRAWER
- SPARE PARTS - SPLIT DRAWER and DOORS
- SPARE PARTS - PANTRY
- SPARE PARTS - SINK CABINET
- SPARE PARTS - STANDARD WALL CABINETS
- SPARE PARTS - CORNER WALL CABINET
- DOOR AND DRAWER REFERENCE TABLE
- Manufacturer One Year Limited Warranty
37
Once the adjacent cabinet has been
aligned with the corner cabinet, level this
cabinet front to back and left to right by
adjusting the leveling legs.
5
Mark a position for pilot hole at the
vertical center of back panel, aligned with
the wall studs.
Referencing the pre marked location, drill
pilot hole using a 5/32” in drill bit. Screw in
the Corner and Adjacent Cabinets into the
wall studs using the Ø6mm x70mm Lag
screws provided.
6
7
Corner Layout Installation
Installation of Base Cabinets