Installation & Assembly

13
Installation Options
Ensure you have followed the recommended steps on page 10.
Once your space has been prepared , measure 3/8” from your wall and rst tile / plank. The
3/8” gap will need to remain as your expansion gap along the perimeter of the room.
3/8” should also provide enough space to install the Silver Finishing Strips at the end. Read
the instructions for Installing the Silver Finishing Strips on page 18-20 before starting.
If you are not installing the Silver Finishing Strips, keep a 3/8” expansion gap between your
wall and tile or plank
Customers have the option of isntalling their own nishing strips, baseboards and quarter
rounds as long as there is at least a 3/8” expansion gap.
Option 1 : Installing NewAge Garage Flooring only
3/8”
Ensure you have followed the recommended steps on page 10.
Once your space has been prepared and all quarter rounds have been removed , line your tile
or plank along the edge of your baseboard.
This will need to remain the same along the perimeter of the room.
Quarter rounds will be installed once the ooring install has been completed.
Option 2 : Installing NewAge Garage Flooring with pre-installed baseboards