Use and Care Manual

6
hp://www.NewAir.com
ELECTRICAL CIRCUIT D IAGRAM
INSTALLATION
Before connecng the appliance to a power source, let it stand
upright for approximately 2 hours. This will reduce the possibility
of a malfuncon in the cooling system from handling during
transportaon.
Before operang your cooler for the first me, follow these steps:
Remove the exterior and interior packing.
Clean the interior surface of the unit with lukewarm water and a so cloth.
Place the cooler on a level surface that will be strong enough to support the
unit when it is fully loaded. To level your cooler, ad
just the front feet located
at the boom of the unit.
FAN3FAN2
FAN1
LIGHT
SERNSOR
PLUG
TRANSFORMER
COMPRESSOR
DISPLAY PCB
CONTROL PCB
MMMM
θ
θ