Installation Sheet

I. Rough in Valve Installation
Note: Use plumbers tape or equivalent to seal all threaded port joints.
1. Do not remove mud cover from valve before locating mounting surface depth in the wall.
2. Do not turn the cartridge stem - temperature settings are pre-calibrated at the factory.
3. Mount valve to cross support using screws (not included). Valve shall be perpendicular and fixed
firmly to cross support to achieve proper trim attachment.(See Fig 1).
4. Place the cross support with valve between wall studs. The min./max. valve depth template on
the mud cover and vertical height desired within tub/shower enclosure determines the exact
cross support placement. Attach cross support to wall studs.(See Fig 2).
5. Ensure opening in finished wall comes in contact with the mudcover to ensure seal with
Thermo Wall Plate shown in Fig. 4. (See TEMPLATE FOR FINISHED WALL OPENING in Fig 9).
Fig. 1
Cartridge stem
DO NOT TURN
Min depth
Max depth
Finished wall
Mud cover
Mud cover
template
Wall stud
Cross support
Fig. 2
NWP-1-742
Screws
(Not included)