Installation Sheet

Recommended Installation by a Professional Plumbing Contractor
Note: The use of petroleum base plumbers putty on our products will nullify the warranty. We recommend
the use of clear silicone sealing materials. Recommended deck hole 2 @ Ø1.25 and 6” apart - center to cen-
ter.
Based on finished wall thickness, installer must use appropriate length 3/4” NPT NIPPLE (1), not included, for
faucet installation.
1. Apply thread sealant to the 3/4-14 NPT taper thread of the NIPPLE (1) and thread into fitting behind finished
wall. Place ESCUTCHEON (2) over NIPPLE (1). Attach faucet BODY (3) to the other end of NIPPLE (1) and
flush against ESCUTCHEON (2). See Figure 1.
2. Thread hand shower RISER (4) to faucet BODY (3). Attach the flex HOSE (5) to RISER (4) and hand SHOW-
ER (6). (Hand-tighten and secure each connection with a wrench ¼ turn.) See Figure 2.
3. Check for leaks and make any final adjustments required.
NWP-934
REV. C