User guide

Recommended Installation by a Professional Contractor
1. Using the table below, measure the appropriate distance between post centers. (See Fig. 1)
Note: Hole locations should be level.
· 18" Single Towel Bar - 18 3/8"
· 24" Single Towel Bar - 24 3/8"
· Tissue Holder - 6 1/4"
2. Drill hole(s) in wall at points marked using the appropriate drill size:
· Wood Screw (#6 x 2”) - use: 3/32" Drill
· Toggle Screw (6-32 x 3”) - use: 3/8" Drill
3. Fasten FLANGES (1) to finished wall using either WOOD/TOGGLE SCREWS (2). (See Fig. 2).
4. Place POST (3) into FLANGE (1). Position POST (3) height to 2-1/16” from mounting sur
face. Secure POSTS (3) into place by tightening SETSCREWS (4). (See Fig. 2)
5. Thread ESCUTCHEONS (3) onto the base of POSTS (4). (See Fig. 3)
5a. Towel Bar: Assemble BAR (5) into END POSTS (4). Slide onto POST (3) and secure
into place with SETSCREWS (6). (See Fig. 4)
5b. Towel Ring / Robe Hook: Slide END POSTS (4) onto BASES (1) and secure into
place with SETSCREW (6). (See Fig. 5)
5c. Tissue Holder: Slide END POSTS (4) onto POST (1) and secure into place with
SETSCREWS (6). Place HOLDER(S) (7) between END POSTS (4). (See Fig. 6)
Towel Bar / Towel Ring / Robe Hook / Tissue Holder
Installation Instructions
Model No. 26-01, 26-02, 26-09, 26-12, 26-28
Distance between
posts
Fig. 2
2
1
3
4
Fig. 3
Fig. 4
Fig. 6
5
4
6
4
3
6
7
1
6
4
1
Fig. 5
2-1/16”
3
4
Fig. 1
4

Summary of content (2 pages)