Installation Guide

UltraShield
TM
Decking Installation Instructions
11
7
Hidden Fasteners (continued)
Option 2: UltraLock System
1. First slide the UL-1 and UL-2 clips into the grooves
of the boards at a 30-45 degree angle at their
respective joists as shown in Diagram 9.
2. Once the clip is in press down and the clip will be
ready to install into the joists as shown in Diagram
10 & 11.
3. Next screw the clips into the joists using a 45 degree
angle.
4. Once all clips are screwed down the next board will
come in at a 30-45 degree angle and then pushed
down into place as shown in Diagram 12.
5. Repeat steps 1-4 until the deck is complete.
Note: Using hidden fasteners that are not
manufactured by NewTechWood nor recommended
by NewTechWood are not warranted. Use these
fasteners at your own risk.
Diagram 9
Diagram 10
Diagram 11 Diagram 12