Instructions / Assembly

36" Hybrid Composite Railing Installation Guide / v20170720 14
9
Pre-drill and install the foot blocks (I-R0217)
with screw WJ0149 on the bottom rail as
shown in diagram 16. Foot blocks should be
evenly spaced out depending on the length
of the final rail and cannot be installed
underneath a pre-drilled baluster hole.
Note: Top rail is A in diagram 17. The holes
should be facing downwards. Boom rail is
B in diagram 17. The holes should be facing
upwards.
The galvanized insert (B-LV-0209) is designed
for a maximum of 1825.7 mm (71.9") as shown in
diagram 13.
The railing is designed for a maximum of 1857.5
mm (73.1") as in diagram 14.
Screw WJ0149
A
B
Screw WJ0149
8
The bottom bracket (H-R0204) should be
installed with screw WJ0149 at 32.5 mm
(1.28") and 24 mm (1") from the end of the
rail which will be placed on the higher
side of the stairs as shown in digram 15.
The bottom bracket (H-R0204) should be
installed with screw WJ0149 at 28 mm (1.1")
and 24 mm (1") from the end of the rail
which will be placed on the lower side of
the stairs. Alternatively, a at board can be
used to press the bracket up against the
end of rail to line up the correct distance.
DIAGRAM 12
DIAGRAM 13
DIAGRAM 14
DIAGRAM 15
DIAGRAM 17
DIAGRAM 16
Note: Need to leave at least 83 mm (3.3")
between the ends of the rail and the rst hole of
each end as shown in diagram 12.