Installation Guide
Decking Installation Guide / v20200731US 16
1
After calculating the decking span and making the frame of your deck, the rst board is ready to be
installed.
Locking Clip (TC-1)
T-Clip (TC-2)
DIAGRAM 21
Option 1:
T-Clip and TC-1 Locking Clip Installation
2
After getting all the TC-1 and TC-2 clips into position above each respective joist, begin to fasten
them from above as shown in Diagram 22 and 23.
Note: The fastest way of installation is by pushing all the boards together and then coming
back and sliding the clips into the grooves from the side and then xing from above.
DIAGRAM 22
DIAGRAM 23
3
Repeat steps 1-2 until the deck is complete.