Installation Guide

T Clip and Locking Clip Installation Continued:
2. After getting all the TC-1 and TC-2 clips into
position above each respective joist, begin to
fasten them from above as shown in Diagram 24
and 25.
Diagram 24
Diagram 25
3. The final installed clips should look like
Diagram 26.
Diagram 26
Note: The fastest way of installation is by
pushing all the boards together and then
coming back and sliding the clips into the
grooves from the side and then fixing from
above.
Note: The locking clip is in the middle of
Diagram 26 to show the expansion and
contraction is happening in both directions. For
more information on how to install the locking
clips and their placement check page 9 of this
installation guide.
Locking Clip
T Clip