Siding Installation Guide v20190507US
CONTENTS Important Note 2-3 Siding Parts 4-5 Under Construction and Framing 6-8 Siding Installation Option 1: Installing the Trims and then Boards 9 - 19 Option 2: Installing the all trims first and then dropping the boards in 19 - 28 Finishing the last board Option 1: F Trim 28 Option 2: Siding Board 28 - 29 Window Installation 29 - 31 Ceiling Installation 32 - 33 Siding Installation Guide / v20190507US 1
IMPORTANT: Read All Sections Before You Start For the most up to date information, please visit our website @ www.newtechwood.com Prior to installing any composite cladding system, it is recommended that you check with local building codes for any special requirements or restrictions. The diagrams and instructions outlined in this guide are for illustration purposes only and are not meant or implied to replace a licensed professional.
(www.aclstaticide.com) on your deck or use anti-static mats before doorways. Ventilation NewTechWood products CANNOT be directly installed onto a flat surface. It must be installed onto a substructure, so there is adequate and unobstructed air flow under the cladding to prevent excessive water absorption.
Siding Parts Product Purpose AW-02 Used for the installation of the first board AW-08 Used at every joist to fix each board to the joist T-7 Used on the last Siding board US09 Siding Board (can be used in place of US30, US31) US44 Part F-Trim, used at the windows US45 I-Trim, used if there is a break between two boards to cover up the gap US46 Outside Corner Trim, used on the outside corners US47 Inside Corner Trim, used on the inside corners Siding Installation Guide / v20190507US 4
Siding Screws Product Purpose *M3 x 12 SS304 Used when locking the board and installing into wood joists *M4 x 13 SS410 Used when locking the board, installing into metal joists, and installing AW-08 *M4 x 80** SS304 **depends on the thickness of your joists Used to install the joist to the wall Part *Note: All screws are based on our recommendation and if the installation requires something different than what is shown, a professional should be consulted before installing.
Under Construction We recommend for the under construction aluminum or pressure treated wood joists. Each cladding board needs to be supported by a joist NO MORE than 1.64 feet (500 mm) from center to center. Extra care is required in order to provide sufficient joisting in and around obstacles such as windows, fascia’s, soffits, guttering, ventilation points etc.
Joist Installation A building professional should be consulted regarding vapor barriers and insulation for your project. Where a vapor barrier is to be used, it should be a breathable type and must be positioned behind the joists. The joist needs to have a minimum thickness of 1 inch (25 mm). Wood joists should be fixed into position at a maximum of 1.64 feet (500 mm) centers using a suitable A4 Stainless Steel Countersunk Wood/Masonry screw.
Expansion and Contraction Values NewTechWood siding boards will experience expansion and contraction with changes in temperature. Expansion and contraction are most significant where extreme temperature changes occur. Fastening the deck planks according to the gapping requirements noted in the following table accommodates for this movement.
Expansion and Contraction table of values for Africa, Middle East, GCC, South America, and Latin America Installation Temperature (Farhenheit) Length (Feet) 3 8 9 10 12 13 13 16 18 50 1/16 2/16 3/16 3/16 4/16 4/16 4/16 5/16 5/16 59 1/16 2/16 2/16 3/16 3/16 3/16 4/16 4/16 5/16 68 1/16 2/16 2/16 2/16 3/16 3/16 3/16 4/16 4/16 77 1/16 2/16 2/16 2/16 2/16 2/16 3/16 3/16 3/16 86 1/16 1/16 1/16 2/16 2/16 2/16 2/16 2/16 3/16 95 3/64 1/16 1/16 1/16 1/1
Locking the Siding Board Every AW-08 clip comes with a separate hole in the case there is a need to lock the board. The Siding boards will expand and contract and to take care of this movement, we must lock the board in one position and then allow the board to expand and contract readily in the other direction. You can see how we lock the board in Diagram 1, 2, and 3. Note: DO NOT LOCK EVERY BOARD. General rule of thumb is every board will only need one locking/ fixation point.
Framing The frame needs to be completely level before installing any Siding boards. Note: Adequate spacing in the joists is required to keep the cladding boards from bending. Please review page 6 of this installation guide to see what spacing is required. The wall as shown in Diagram 4 will be installed to replicate different scenarios potentially occurring when installing the Siding. DIAGRAM 6 DIAGRAM 4 1 First start by fixing the joist onto the wall you plan to install on.
Option 1: Installing the Trims and then Boards Inside Corner Trim 1 The inside corner will be installed as shown in Diagram 8 by first pre drilling and then fixing with screws. DIAGRAM 9 Starting Strip 1 The starting strip will now be installed on the bottom of the joists as shown in Diagram 10 by first pre drilling into the AW-02 and then fixing with screws. 2 Repeat step 1 and install the rest of the starting strip onto the rest of the joists.
Siding Board 1 3 Take a Siding board and place the side with the lip down as shown in Diagram 11. When you are on the last board of the Siding you will need to first install T-7. The T-7 will be installed onto every joist first and then the Siding board will be installed like normal as shown in Diagram 13. Note: The T-7 is used as a place holder for the last board, so that the board will not slant. DIAGRAM 11 2 Place the AW-08 on the board and install with screws as shown in Diagram 12.
4 After installing the last board, the Siding should look like Diagram 14. Outside Corner Installation 1 Next, take the outside corner and fix it to the side of the Siding that is open as shown in Diagram 15.
2 Fix the outside corner by screwing on the opposite face of the outside corner. Note: Always pre-drill before screwing unless using composite screws designed f o r n o n p r e - d r i l l i n g . Th e d i s t a n c e between each screw should be no more than 12 inches (300 mm) center to center. DIAGRAM 17 Siding Board 1 Now you are ready to install the other side of the wall as Diagram 18. Repeat steps 1-2 of starting strip on page 12 of this installation guide.
F Trim Installation 1 DIAGRAM 19 An F trim can now be used to finish off the open side of this Siding as shown in Diagram 21 and 22. Note: Always pre-drill before screwing unless using composite screws designed f o r n o n p r e - d r i l l i n g . Th e d i s t a n c e between each screw should be no more than 12 inches (300 mm) center to center.
DIAGRAM 23 Siding Board DIAGRAM 22 1 Now the other side of the inside corner wall will be installed. First, attach the AW-02 at the bottom of the wall as steps 1-2 of starting strip on page 12 of this installation guide.. Diagram 23 is an above cross section view of the F trim after installation. The outside was installed after the Siding was installed on one of the walls. Then the F trim was pushed into the opened side of the Siding and then screw fixed from the other side.
2 Then, install the Siding boards as shown in Diagram 25 by repeating the steps 1-3 of Siding board on page 13 of this installation guide. I Trim Installation 1 Using the I trim install the I trim on the opened side of the Siding as shown in Diagram 27. DIAGRAM 25 3 Continue to install the Siding boards until the top is reached as shown in Diagram 26.
2 Fix the I trim to the joist by screw fixing the I trim and joist. Note: Always pre-drill before screwing unless using composite screws designed f o r n o n p r e - d r i l l i n g . Th e d i s t a n c e between each screw should be no more than 12 inches (300 mm) center to center. DIAGRAM 29 2 Next install the Siding board on top of the AW-02 and install the clips as steps 1-3 of Siding board on page 13 of this installation guide.
F Trim Installation 1 Install the F trim on the open side of the Siding as shown in Diagram 33. DIAGRAM 31 DIAGRAM 33 2 Fix the F trim to the joist by screw fixing into the F trim to the joist as shown in Diagram 34. Note: Always pre-drill before screwing unless using composite screws designed f o r n o n p r e - d r i l l i n g . Th e d i s t a n c e between each screw should be no more than 12 inches (300 mm) center to center.
Option 2: Installing the all trims first and then dropping the boards in Inside Corner 1 The inside corner will be installed as shown in Diagram 36 by first pre drilling and then fixing the screws. DIAGRAM 34 3 After completing all walls you should have the following installation as shown in Diagram 35.
Outside Corner 2 The outside corner will be then be installed next as shown in Diagram 37. DIAGRAM 38 F Trim 3 The F trim will now be installed on the open side as shown in Diagram 39. DIAGRAM 37 Diagram 38 is an above cross section view of the outside corner after installation. The outside corner was first installed onto the joists and then the boards were slotted into both openings when installed.
I Trim 4 F Trim The I trim will be installed on walls there one board does not go all the way across as shown below in Diagram 40. DIAGRAM 40 5 The F trim be now be installed on the other open side as shown in Diagram 41.
Starting Strip 6 Siding Board Install the starting trim on the F trim and outside corner wall as shown in Diagram 42. 7 The siding board can now be installed over the starting trim as shown in Diagram 43 using the AW02 clips. The siding board will need to be dropped in from the top of the wall in order to fit in both slots of the trims / corners.
8 The rest of the Siding will be slotted in from the top and installed with AW02 clips as shown below in Diagram 44. DIAGRAM 44 9 The other wall will be installed in the same manner as Diagram 45, and 46.
10 The completed wall should look like the following as shown in Diagram 47.
11 The walls utilizing the I Trim shown in Diagram 48 should also be done in the same manner as 49, 50, 51, 52, and 53.
DIAGRAM 50 DIAGRAM 51 Siding Installation Guide / v20190507US 28
DIAGRAM 52 DIAGRAM 53 Siding Installation Guide / v20190507US 29
12 After completing all walls you should have the following installation as shown in Diagram 54. 3 Now fix face the cut pieces to the tops of the joists as shown in Diagram 57. Note: Always pre-drill before screwing unless using composite screws designed f o r n o n p r e - d r i l l i n g . Th e d i s t a n c e between each screw should be no more than 12 inches (300 mm) center to center.
2 Install the T-7 gaskets onto the joists at 1 inch from the top of the ceiling as shown Diagram 59. DIAGRAM 61 DIAGRAM 59 DIAGRAM 62 5 3 Take a Siding board and cut it down to the measured length from the ceiling to the second to the last Siding board as shown in Diagram 60. The final finished installation should look like Diagram 63. DIAGRAM 63 Window Installation DIAGRAM 60 1 4 Take the Siding board and install it onto the clips and over the T-7 gaskets.
DIAGRAM 64 2 DIAGRAM 66 Take the Siding board and cut down the middle to create a rectangle to fit in the window as shown in Diagram 65. DIAGRAM 65 3 Take the cut pieces and install them to the frame of the window as shown below in Diagram 66 and 67. Note: Always pre-drill before screwing unless using composite screws designed f o r n o n p r e - d r i l l i n g . Th e d i s t a n c e between each screw should be no more than 12 inches (300 mm) center to center.
4 Take the F trim and cut to match the corners of the window as shown below in Diagram 68. DIAGRAM 68 5 Install the cut F trim pieces over the cut composite Siding as show in Diagram 69 and 70. Note: Always pre-drill before screwing unless using composite screws designed f o r n o n p r e - d r i l l i n g . Th e d i s t a n c e between each screw should be no more than 12 inches (300 mm) center to center. DIAGRAM 69 DIAGRAM 70 6 The completed window installation should look like Diagram 71.
Ceiling Installation 1 The span for the ceiling should be 12 inches (300mm) center from center as shown in diagram 72. DIAGRAM 74 4 Note: One of the clips needs to lock the board, if you are unfamiliar with this, please go to page 10 of this installation guide to understand how to lock the board with AW-08. DIAGRAM 72 2 On each joist place an AW-08 clip and fix the clip to the joists as shown in Diagram 75. First install the AW-02 starting aluminum strip to the joist as shown in Diagram 73.
8 Place the last board and pre-drill as shown in Diagram 79. DIAGRAM 76 6 Repeat steps 4, 5, and 6 and install the rest of the boards as shown in Diagram 77. DIAGRAM 79 9 DIAGRAM 77 Next take screws and fix the joists through the pilot holes as shown in Diagram 80. Note: Do not over tighten the screws. 7 Install a 3/10 inches (8 mm) thick wood piece on each joist or a strip that is 3/10 inches (8 mm) thick for installing the last board as shown in Diagram 78.
Siding Installation Guide v20190507US ©2019 Huidong Meixin Plastic Lumber Products Manufacturing Co., Ltd. NewTechWood® is a registered trademark of Huidong Meixin Plastic Lumber Products Manufacturing Co., Ltd. To obtain a copy of the most current version of this installation guide, visit us online at www.newtechwood.com.