Installation Guide

Siding Installation Guide / v20190507US 13
DIAGRAM 13
DIAGRAM 12
2
Place the AW-08 on the board and install
with screws as shown in Diagram 12. Please
review page 10 of this installation guide on
how to lock the board with AW-08.
Note: A gapping of at least 25/64 inch
(10 mm) needs to be le at the boom
of the ground and the lip of the board to
allow for expansion and contraction and
ventilation.
3
When you are on the last board of the Siding
you will need to first install T-7. The T-7 will
be installed onto every joist rst and then the
Siding board will be installed like normal as
shown in Diagram 13.
Note: The T-7 is used as a place holder
for the last board, so that the board will
not slant.
DIAGRAM 11
1
Take a Siding board and place the side with
the lip down as shown in Diagram 11.
Siding Board