Installation Guide

Siding Installation Guide / v20190507US 31
2
Install the T-7 gaskets onto the joists at 1
inch from the top of the ceiling as shown
Diagram 59.
3
Take a Siding board and cut it down to the
measured length from the ceiling to the
second to the last Siding board as shown
in Diagram 60.
5
The final finished installation should look
like Diagram 63.
4
Take the Siding board and install it onto the
clips and over the T-7 gaskets. Next pre-
drill and face x onto every joist as shown
in Diagram 61, 62.
Note: When face xing remember to rst
pre-drill a hole. The screw should be a
minimum length of 1’ 3/4 inch in order
to ensure it goes through the board and
into the joist underneath.
DIAGRAM 59
DIAGRAM 61
DIAGRAM 62
DIAGRAM 63
1
Windows should be installed after all Siding
has been installed on the wall as shown in
Diagram 64.
Note: This installation of the window will
be done on joists and framing that are on
wood.
If installation is done on a brick or
concrete wall framing, metal joists, or
wood, joists need to be added first in
order to install the boards onto that
structure. Installing directly on brick or
concrete is not recommended.
Window Installation
DIAGRAM 60