Installation Guide
Siding Installation Guide / v20190507US 6
Under Construction
We recommend for the under construction aluminum or pressure treated wood joists. Each cladding
board needs to be supported by a joist NO MORE than 1.64 feet (500 mm) from center to center. Extra
care is required in order to provide sufcient joisting in and around obstacles such as windows, fascia’s,
softs, guttering, ventilation points etc. Below is an example of the layers that would occur in a typical
installation, but a licensed professional should always be consulted prior to any installation.
Joist
Brick
Insulation
Breathable Membrane
NewTechWood UltraShield Cladding