Instructions / Assembly

U
6' Traditional Fence Installation Guide / v20221212US 4
Installation Procedure
Seing the Posts
1.1 Dig the holes. It is about a third as deep as the post height.
1.2 The hole diameter is three times the width of the post.
1.3 Layer 6" of gravel at the bottom of the hole for proper drainage.
1.4 Position the posts in the center of the holes.
1.5 Ensure the posts are plumb using a two-side post level.
1.6 Pour the concrete into the hole. Work it to about 2" below the surface to allow for
ll soil or dirt back into the holes.
1.7 Check and verify the posts are still plumb again.
1.8 After the concrete has cured, ll the soil or dirt back into the holes.