Installation Guide
 18 
SLATESTONE OUTSIDE CORNER  
Step 1  
Metal Starter Strip - Determine at what height above grade level you 
want the panel to sit. Measure up 2 ¾" from this point and strike a level 
line. Attach the top of the starter strip on this line. End the strip 2" 
from each side of the corner.  
Step 2  
Set the Slatestone outside corner piece against the corner and down 
into the starter strip. Use the screw guides and place at least 3 
screws along the tongue. Place 2 screws in the right lap side of the 
panel where indicated.  
Step 3  
Attach the panels working out from each side of the corner as 
 previously described.  
Note: There are 4 patterns of the Slatestone Outside Corner.  
2 Left patterns and 2 right patterns. Check for numbers on the 
backside of the piece. They are numbered 1 through 4. Alternate 
left and right corners with each course to prevent pattern repetition. 
 CORNER INSTALLATION 
All products must be allowed to acclimate; r emoved fr om boxes and stored flat at the 
installation site for a minimum of 48 hours or until properly acclimated prior to installation. Heat 
and moisture cause expansion. Best results are obtained by installing a cool, dry product. 
NextStone™ does not warrant against gapping caused by expansion and contraction or 
 improper installation.  










