Installation Guide
 22 
  PANEL INSTALLATION 
SLATESTONE PANEL  
Metal Starter Strip - Determine at what height above grade level you want the panel to 
sit. Measure up 2 ¾" from this point and strike a level line. (Fig. 1) 
Determine which type of wall installation is required.   
1) Paneling the wall using Window Door Trim as termination 
molding. 
Install Window and Door Trim (WDT) to both ends of the wall. 
Insert panel into starter strip and slide behind WDT. Attach to the 
wall using the screw indicator marks on the top and right end 
tongues. (Fig. 2) Firmly press the next panel against the first panel 
and repeat working left to right. At the end of the course; cut the 
right end of the final panel to fit behind WDT. Use the drop off 
from that panel to start the new row behind the left end WDT. If 
necessary, cut some additional length from the off fall pieces on 
some rows to prevent panel ends from lining up vertically. 
2) Paneling a wall using a WDT as a termination molding on the left 
Dry fit the first corner into the starter strip. Secure with screws if necessary. Moving from right 
to left: dry fit panels tightly across the wall. Cut the left end of the final panel behind the 
Window Door Trim or flush to the wall. If not using WDT, remove the dry fit panels and corner 
piece. Panel the wall from left to right. Reattach corner over right panel. Repeat on each row. 
3) Paneling a wall with outside corners on the right and left 
Dry fit Slatestone Corners on the left and right. Secure panels moving towards the 
center from both directions. Cut a panel to meet the remaining measurement. Finger 
joints on either the left panel or the right panel will need to be cut to accommodate the 
final cut piece. Secure the cut piece into the allotted space and screw in to secure all 
panels. Using the fall off of cut panel, secure the finger joints on the end to other left or 
right corner and begin the next course as described above. (Fig. 2) 
*Finger joints can be cut on both panels (See figure 6 on 
page 24) to accommodate a cut piece.  
4) Dry fit panels from left to right 
Cut first panel on the left to fit flush against the left wall. The 
final panel in the course may need to be cut to fit properly flush 
to the “right” wall. Us the off cut panel to begin the second 
course at the left. Repeat this method to complete your wall.  
Important: Drive the first screw on the right hand side of 
the panel at a 45 degree angle to the left in order to 
tighten the panel into adjacent the panel, corner or wall. 
Visit the NextStone™ classroom at 
Figure 1 
Figure 2 










