Installation Guide
 37 
SLATESTONE 1 & 2 PC POST COVER, Cont. 
8) Attach the cap by applying adhesive around the top  
surface of the post. (Fig. 8) In addition, apply adhesive to 
the inside top of the cap along the inside ledge. ( Fig. 9) 
9) Install Rail Mounts.  After locating the desired height of 
the railing and securely attaching the mounts (see #5), 
measure up on the outside of the post cover, and select the 
spot to place the landing. In this example, Trex ™  
universal mounts are used. When the landing location is  
decided, dry fit the landing on the rock surface. Using a 
carpenter knife or chisel, cut out the high points of the rock 
surface to achieve a smooth flat surface. (Fig 10-13) 
Use 3” screw 
10) Using 3" deck screws minimum, attach the mount to the post,  
screwing through the pillar into the landing attached in section 5.
(Fig. 14-15) 
11) Finish the job using NextStone™ Textured Grout and Paint 
kit to cover any space around the mountings and to hide screw 
heads . (Grout and Touch Up Kit sold separately). (Fig. 16) 
Finished Post and Cap  
(Fig. 16) 
(Fig. 15) 
(Fig. 14) 
(Fig. 13) (Fig. 12) (Fig. 11) (Fig. 10) 
(Fig. 9) 
(Fig. 8) 










