Installation Guide
 10 
BASIC TOOLS / EQUIPMENT 
SAFETY EQUIPMENT 
Always wear safety glasses for eye protection. Wearing a dust mask is recommended. 
HAND TOOLS 
Any  wood  cutting  saw  with  a  fine 
tooth  steel  or  carbide  tip  blade. 
(NextStone™  does  not  dull  blades 
and  does  not  require  a  special 
blade).  4'  level,  tape  measure, 
chalk  line,  power  or  cordless  drill 
with  4"  bits  or  extension,  framing 
square  or  speed  square,  jigsaw  or 
saber saw, wood rasp, and caulking 
gun. 
FASTENERS 
For  exterior  applications,  good  quality  deck  screws  or  stainless  steel  screws  are 
recommended. Concrete applications require mechanical fasteners such as Tapcon™ 
and  possibly  an  adhesive  for  additional  support  (adhesive  is  not  required  for 
installation). The length of the screw will vary depending on the panel thickness or 
accessory piece being installed. Verify length under section specific to product being 
installed.  Using the screw guide points on the panel screw hems, screw through the 
substrate and into a stud when practical, with a  minimum  of  6  screws  per  panel 
and a screw no less than 1" from each end of the tongue as well as in the bottom 
right  corner  of  the  tongue.   Plumbers tape is used to install outside corners  (non 
flush). Allow 1 roll for 4 outside corners. 
ADHESIVE  
The use of adhesives is optional, however they may allow for an easier installation 
process  in  certain  small  applications.    NextStone™  recommends  the  use  of  a  good 
quality polyurethane adhesive such as PL Premium Construction Adhesive by Loctite. 
Most construction based adhesives are not compatible with polyurethane and should 
never be used. The surface where the adhesive is to be applied must be sanded and 
cleaned prior to applying the adhesive in a vertical application. If using an adhesive 
other than those NextStone™ recommends, testing on a panel prior to beginning an 
installation is advised.  










