Installation Guide
 12 
STARTER STRIP INSTALLATION 
STARTER STRIP 
In order for  NextStone™ panels to be  installed level and to  avoid screwing through 
the rock face of the panel, the starter strip at the base of the wall must be level. 
Step 1 
Mark the wall horizontally where you want the bottom of the panel to rest. Measure 
up  2½"  to  3"  depending  on  ground  level  surface  and  partially  drive  a  nail  at  one 
corner for attaching your chalk line. 
Step 2 
Attach  a  chalk  line:   go  to  the  next  corner, repeat  step  1,  and  pull  the  line  taut. 
Make sure the line is level by using a line level or 4' level. 
Step 3 
Snap the chalk line and repeat the procedure on each area to be covered. 
Step 4 
Backset  the  starter  from  the  edge  1  ¾"  for  Interlocking  Outside  Corners,  2  ¼"  for 
door/window trim, 3 ¾" for inside corners or 2" for Sandstone Outside Corners.  
Step 5 
Place the top edge of the starter strip on the chalk line with the “v” at the bottom 
away from the wall. Screw the starter to the substrate using screws every 16". Make 
sure Starter Strip is level. This will give ¾" clearance from the bottom of the panel 
to  the  ground.    If  additional  clearance  is  required,  adjust  the  starter  strip  height 
accordingly. 










