Installation Guide
 19 
 CORNER INSTALLATION 
All products must be allowed to acclimate; removed fr om boxes and stored flat at the 
installation site for a minimum of 48 hours or until properly acclimated prior to installation. 
Heat and moisture cause expansion. Best results are obtained by installing a cool, dry  
product. NextStone™ does not warrant against gapping caused by expansion and contraction 
or improper installation.  
Step 1 
Metal Starter Strip - Determine at what height above grade level 
you want the panel to sit on. Measure up 2 ¾" from this point and 
strike a level line. Attach the top of the starter strip on this line. 
End the strip 2" from each side of the corner. 
Step 2-Set the Stacked Stone outside corner piece against the 
corner and down into the starter strip. Use the screw guides 
and place at least 3 screws along the tongue. Place 2 screws 
in the right lap side of the panel where indicated. (Fig. 7). 
Figure 7 
Step 3-Attach the panels working out from each side 
of the corner as previously described. (Fig. 8) 
Figure 8 
Note: There ar e 4 patter ns of the Stacked Stone Outside 
Corner. 2 Left patterns and 2 right patterns. Check for  
numbers on the backside of each corner piece. They are 
numbered 1 through 4. Alternate left and right corners with 
each course to ensure offsets and to prevent pattern  
repetition. 
STACKED STONE OUTSIDE CORNER  










