Installation Guide

BASIC TOOLS AND MATERIAL
SAFETY EQUIPMENT
Always wear safety glasses for eye protection. Wearing a dust mask is recommended.
HAND TOOLS
Power Drill
Saw
Chalk Line
Stud Finder
Tape Measure
FASTENERS
Finishing Nails
Screws
Toggle Bolts
ADHESIVE
Construction Adhesive (compatible with Polyurethane)
Caulk or Wood Filler
ADDITIONAL MATERIAL
2x4 Sanded Smooth Lumber Board - used for framing to secure the beams.
(The 2x4 can be cut into smaller blocks and installed onto the ceiling every 3 to 6
feet to provide a secure platform for the beams to attach to.)
Before installation, acclimate the beams to the application site for at least 24 hours.
Open the box and let the beams breathe”.
For most applications, toggle bolts are recommended to secure to the wood blocks or
boards to ceiling.