Installation Guide

18
PANEL INSTALLATION
ALL PANEL PROFILES
Step 1
Metal Starter Strip - Determine at what height above grade level
you want the panel to sit. Measure up 2 ½" to 3" from that point
and strike a level line. (fig. 1)
*See page 12 for more specific Starter Strip install instructions.
Step 2
Determine which type of wall installation is required and follow the steps provided
below:
A) Paneling the wall using Sandstone Window Door Trim as termination pieces
on both ends
Install Sandstone Window and Door Trim (WDT) to both ends of
the wall working left to right. Insert panel into starter strip and
slide behind WDT. Using the screw indicator marks on the top
and right end tongues of panel, (fig. 2) firmly fit the next panel
into the first panel and repeat to the end of the course. Cut the
right end of the final panel to fit behind WDT. Use the left over
cut piece to start the next course to avoid a vertical seam at
final cut on each course. Screw panels into existing substrate.
B) Paneling the wall using Sandstone Window Door Trim as a termination piece
with a panel corner
Dry fit the first corner into the starter strip. Secure with screws if necessary. Dry fit
panels tightly against corner and across the wall. Cut the left end of the final panel
to fit behind the Window Door Trim. Repeat each course.
Figure 1
Figure 2
All products must be allowed to acclimate; remove from boxes and store at the
installation site for a minimum of 48 hours. Heat and moisture cause expansion. Best
results are obtained by installing a cool, dry product. NextStone™ does not warrant
against gapping caused by expansion or contraction due to improper installation.