Installation Guide

18
SLATESTONE OUTSIDE CORNER
Step 1
Metal Starter Strip - Determine at what height above grade level you
want the panel to sit. Measure up 2 ¾" from this point and strike a level
line. Attach the top of the starter strip on this line. End the strip 2"
from each side of the corner.
Step 2
Set the Slatestone outside corner piece against the corner and down
into the starter strip. Use the screw guides and place at least 3
screws along the tongue. Place 2 screws in the right lap side of the
panel where indicated.
Step 3
Attach the panels working out from each side of the corner as
previously described.
Note: There are 4 patterns of the Slatestone Outside Corner.
2 Left patterns and 2 right patterns. Check for numbers on the
backside of the piece. They are numbered 1 through 4. Alternate
left and right corners with each course to prevent pattern repetition.
CORNER INSTALLATION
All products must be allowed to acclimate; removed from boxes and stored flat at the
installation site for a minimum of 48 hours or until properly acclimated prior to
installation. Heat and moisture cause expansion. Best results are obtained by installing
cool, dry product. NextStone does not warrant against gapping caused by expansion
and contraction.