Install Instructions

11
Step 3: Pass all AV, Integration, and Power Cables for
Projector and E-500 Lift System through Cable Outlet inside
the terminal.
Note: If you purchased the lift with the CSI Kit, make sure to
manage the cable for Contact Closure or the IR Receiver as
well.
Step 4: Cinch the cables within the terminal using the Cable
Strap. Do not completely fix the cables in place. Slack will be
need to manage the cables further in a later step.
Note: Leave about 2 ft of cable length inside the Actuation
System to allow for further cable management.
Step 5: Re-attach the Left Cable Terminal Cover by sliding the back end in first, pushing the front end down, then using
both of the Phillips Screws to fasten it into place.
Note: You may need to gently pull on the Dust Cover to completely seat the Terminal Cover