Install Instructions

12
Installing the Actuation System
For these steps you will need the following:
E-500 Actuation System
(Pre-Framed) Installation Bracket
(4) Fine Adjustment Screws
3mm Allen Key or T-Handle (Provided)
Step 6: Take a moment to locate the Snape Feature on each side of the Actuation System. Now press and snap the
Actuation System into place within the Installation Bracket. Ensure the front of the Actuation System faces in the
direction of the projector screen and the front of the Installation Bracket.
Important Note: Ensure both of the Snap Features engage before letting go of the Actuation System. When the Snap
Features are fully engaged, the Actuation System will be flush with the bottom face of the Installation Bracket.
Step 7: Place the (4) Fine Adjustment Screws through
the underside of the Actuation System into the
Installation Bracket and partially fasten them using a
3mm T-Handle or Allen Key.
Note: Do not completely fasten these screws as
adjustments will be covered in a later step.
Front of System
Snap
Feature