Install Instructions

17
Step 15: Connect and manage any cables for integration or
the projector and feed any excess cable back up and through
the Left Cable Terminal.
Step 16: Press and slide the Carrier Shroud into the L shaped slots located on the left and right side of the Crossmember
then fasten the Carrier Shroud to the Crossmember using (4) 5 x 14mm FHMS Screws, (2) per side. Reference the arrows
shown in the images below for direction.