Install Instructions

19
Step 19: Using your remote, run the E-500 into the UP position to measure the flushness of the Ceiling Panel relative to
the surrounding ceiling.
Note: If adjustments are needed, run the system down, remove the Interface Plate then tighten the Fine Adjustment
Screws to move the Ceiling Panel UP, and loosen the Fine Adjustment Screws to move the system DOWN.
Important Note: You must adjust the Fine Adjustment Screws in a Star Pattern and in Increments. Do not fully
adjust each screw individually as this may potentially cause the system to wedge itself inside the Installation Bracket.
Step 20: Once the Ceiling Panel is flush, remove the Ceiling Panel, run
the lift into the UP position, and fasten the (4) Set Screws located in
the four corners of Actuation System.
Note: These Set Screws ensure the position of the system does not
move or shift during operation.
Step 21: With the Ceiling Panel still removed, place the Trim
Ring on to the underside of the unit, and fasten it using (4) 5 x
14mm FHMS Screws.
Front
(Gap Exaggerated for Clarity)