Technical Specifications
NICHIHA INSTALLATION GUIDE FOR SIX-FOOT HORIZONTAL PANELS
26
HORIZONTAL/COMPRESSION JOINTS
ALL APPLICATIONS
For any buildings of three or more stories
or 45 feet, horizontal compression joints
are required.
For metal framing, add a joint every 25 feet
for projects of more than three stories. For
wood framing, a joint is required at each oor
for projects of three stories or more. Avoid
spanning oor lines with panels at joints.
Please contact the Nichiha Technical
Department for assistance.
INSTALLING A HORIZONTAL
COMPRESSION JOINT
Install Essential Compression Joint Flashing
or a heavier gauge z-shaped metal flashing
or drip cap over the top edge of the course
of panels terminating under the horizontal
compression joint location. Fasten Flashing at
each stud location. A best practice is to add
flashing tape to cover the top edge of the
flashing and its fasteners.
The top ship-lapped edge of the bottom
panel is cut and secured by face fastening (1”
below panel cut edge) or use of the Finish Clip
(JE310) with the appropriate Spacer behind:
10mm for face fastening, 5mm for Finish Clip.
Install Starter Track above trim or z-flashing
such that the next course of panels sit at
least 1/2 inch above the course below it.
Remember the bottom ship-lapped edge
of panels extend 3/4” below Starter, so the
Starter will need to be installed at least 1-1/4”
above the edge of the panel course below the
joint.
Check for level.
(Figure 52)
Continue to install panels according to these
guidelines with compression joints at the
appropriate elevation(s).
Fig. 52
Essential Compression
Joint Flashing
Ultimate Starter Track