Installation Instructions

Table Of Contents
3
CONNECTION AND OPERATION
1. First, connect the transmitting cable coming from the antenna to the
corresponding connector placed in the rear panel of the unit; check that
it is tightened properly.
2. Then connect the plug to the AC mains and also make a good ground
connection.
3. Once these procedures have been performed, you can turn the power
on. The transmitter requires about 20 to 30 seconds to perform the
internal checks and lock onto the frequency. After that, it will start
delivering power.
4. Always start with low power and keep an eye on the reading of the
reflected power to be sure that your system (antenna, cables etc.) is
performing well.
5. Allow the unit to warm up for about 30 minutes and then you can
increase the power to the desired level.
6. Wait another 30 minutes to verify that everything is working properly.
7. Check the air coming out from the rear fans and verify that it is just
warm air not overly hot. At this point, if everything looks good, you can
consider your installation successful.