Installation Guide

CLR Kit Installation With Existing Frame
Make sure all power is turned o before beginning installation
Turn on power and verify proper operation.
7
Fasten the LED retrot kit MC cable to the J-Box using the included MC connector.
3
Make wiring connection to junction box.
a. Connect Black wire to line wire.
b. Connect White wire to neutral wire
c. Connect Green wire to ground wire
d. Route and connect Purple and Grey 0-10V dimming
control wires in accordance with dimmer instructions
and electrical code.
4
Put back J-Box cover plate
(with lamp ballast still
attached to it).
5
Lift upward on retention tabs while pushing the retrot
kit through the rough-in, release the retention tabs and
push trim ush to the ceiling, ensuring a secure t.
6
EXISTING BALLAST BOX
LINE
Black (line)
Ground
White (neutral)
Purple (dim +)
Grey (dim -)
Black (line)
Green (ground)
White (neutral)
Purple (dim +)
Grey (dim -)
CLR
NOTE: If 0-10V dimming is NOT to be connected, it is recommended to cut o the exposed, tinned leads on the purple and
grey wires, and cover the ends with a small piece of electrical tape or wire nut. If bare 0-10V control wires should
accidentally touch a grounded surface, it could cause unintended ickering or dimming of the light xture.