Installation Guide

NICOR, Inc. | 2200 Midtown Place NE, Albuquerque, NM 87107 | 800.821.6283 | www.nicorlighting.com | June 15, 2015 3:00 PM
VT1 Extreme Environment LED Vaportite
INSTALLATION INSTRUCTIONS
Model: VT1-10H-UNV-50K-BK
VT1-10S-UNV-50K-BK
IMPORTANT - READ CAREFULLY BEFORE INSTALLING FIXTURE. RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE.
Must be wired in accordance with the National Electrical Code and all applicable local codes. Proper grounding is required for safety. THIS
PRODUCT MUST BE INSTALLED IN ACCORDANCE WITH THE APPLICABLE INSTALLATION CODE BY A PERSON FAMILIAR WITH THE
CONSTRUCTION AND OPERATION OF THE PRODUCT AND THE HAZARDS INVOLVED.
WARNING: Make certain power is OFF before installing or maintaining xture.
No user serviceable parts inside.
NOTE: when drilling holes in the plastic J-box, it is highly recommended to use a stepped drill bit to lessen the chances of personal
injury or damage to the xture
The VT1 Extreme Environment LED Vaportite is designed for use in
demanding applications. Thermally conductive plastic & noncorrosive
materials make this xture a versatile choice for any environment.
Carefully unpack the unit from its packaging and inspect for defects
before installation.
Loosen the four screws holding the junction box top to the main
body. It is not necessary to completely remove the screws as they
will be retained by the capture tab, making later re-installation more
convenient. Remove the j-box top. Determine the desired mounting
method: hanging, pendant, or surface mount.
Note: if 0-10V dimming is to be enabled, please go to 0-10V dimming
installation.
Chain or Cable Hanging Mount
Drill the appropriate sized hole in the top of the black plastic junction
box to accommodate the cable gland. Install the cable gland and feed
the AC supply line through the gland into the top of the junction box.
Secure a cable/chain hook to each of the 4 corner mounting loops
on the main xture body. Secure the cable/chain to the supporting
structure, and hang the xture in the desired position being sure to
follow all UL, NEC, and minimum load ratings guidelines.
Feed the AC supply line through the cable gland into the top of the
junction box and tighten the seal around supply line. Connect the
xture driver AC input wires to black (line), white (neutral), and the
xture green grounding tether wire to ground using UL listed wire
connectors.
Re-install the top of the junction box onto the main xture and secure
with the 4 screws. Take care to ensure all wires are inside junction box,
the junction box is seated properly on the gasket, and not to over-
tighten the screws thus cracking the plastic screw bosses.
1
2
2
3
4
3
5
6
Warranty
For complete warranty information please visit :
http://nicorlighting.com
4
5
6
Drilling
Location

Summary of content (3 pages)