User's Manual

6 Checking and Adjusting
106 Trimble TS635 Construction Total Station User Guide
Adjusting the calibration
1. Press [MENU] and [6]. The calibration screen
appears.
2. Take an F1 measurement to a target on the
horizon. Press [ENT].
The calibration fields for F1 are:
The vertical angle is shown in the V0 dir= Horiz setting.
When you have taken the measurement, the message on the bottom line
changes from
DO NOT TOUCH! to Turn to F2.
3. Take an F2 measurement to the same target. Press [ENT].
The TS635 construction total station has horizontal and vertical axis
adjustment:
When the observation on F2 is completed, four
parameters are displayed.
4. Do one of the following:
To return to the first observation screen,
press
[ESC] or select the Redo softkey.
To set parameters on the instrument, press
[ENT] or select the OK softkey.
5. If ACV, ACH, or Tilt is out of range, OVER
appears. Press any key to return to the first
observation screen.
X1 Face-1 X-axis tilt value
Y1 Face-1 Y-axis tilt value
VA1 Face-1 vertical angle (tilt-off value)
HA1 Face-1 horizontal angle (tilt-off
value)
X2 Face-2 X-axis tilt value
Y2 Face-2 Y-axis tilt value
VA2 Face-2 vertical angle (tilt-off value)
HA2 Face-2 horizontal angle (tilt-off
value)