User's Manual

Spectra Precision Focus 4 Total Station User Guide 95
Menu Screen 5
Setting the control job
A control job has the same format as a standard job. You can open and modify it like
any other job, and you can use it to record any measured data.
To set the control job:
1. Highlight the job that you want to use as the
control job.
2. Select the
Ctrl softkey.
A confirmation screen appears.
3. Do one of the following:
To set the selected job as the control job,
press
[ENT] or select the Yes softkey.
To cancel the process, press [ESC] or select
the
No softkey.
If a control job is already assigned, the newly
assigned control job replaces it as the control job.
To clear the selected control job, highlight the
current control job in the job list and select the
Ctrl softkey. Then press [ENT] or select the Yes
softkey.
Displaying job information
To display job information, highlight the job name and
then select the
Info softkey.
The Information screen shows the number of records in
the job, the free space, and the date when the job was
created. Free space indicates how many points can be
stored in the job.
To return to the job list, press any button.