Owner's Manual

MT-4
[RS5F70A]
PREPARATION
PREPARATION
PFP:00002
Special Service Tools
ECS005TE
The actual shapes of the Kent-Moore tools may differ from those of the special service tools illustrated here.
Tool number
(Kent-Moore No.)
Tool name
Description
KV38107700
(J39027)
Preload adapter
Measuring turning torque of final drive assem-
bly
Measuring total turning torque
Measuring clearance between side gear and
differential case with washer
Selecting differential side bearing adjusting
shim [Use with KV38106000 (J34291-B).]
KV38106000
(J34291-B)
Height gauge adapter
(differential side bearing)
Selecting differential side bearing adjusting
shim [Use with KV38107700 (J39027).]
a: 140 mm (5.51 in)
b: 40 mm (1.57 in)
c: 16 mm (0.63 in) dia.
d: M8 × 1.25P
KV32101000
(J25689-A)
Pin punch
Removing and installing retaining pin
Removing and installing lock pin
Removing selector shaft
Removing welch plug
a: 4 mm (0.16 in) dia.
KV31100300
(J25689-A)
Pin punch
Removing and installing retaining pin
a: 4.5 mm (0.177 in) dia.
ST30031000
(J22912-01)
Puller
Removing 3rd, 5th input gear
Removing 3rd & 4th and 5th & Rev synchro-
nizer hub
Removing mainshaft rear bearing
Removing 2nd gear, 5th gear bush
Removing 1st & 2nd synchronizer hub, 1st
and 4th main gear
Removing and installing differential side bear-
ing
a: 90 mm (3.54 in) dia.
b: 50 mm (1.97 in) dia.
ST30021000
(J22912-01)
Puller
Removing input shaft front and rear bearing
Installing input shaft front and rear bearing
Installing 5th input gear, 3rd main gear and
4th main gear
Installing 1st & 2nd, 3rd & 4th and 5th & Rev
synchronizer hub
Installing 2nd gear bush, 5th gear bush, Rev
gear bush
Installing mainshaft rear bearing
a: 110 mm (4.33 in) dia.
b: 68 mm (2.68 in) dia.
NT087
NT418
NT410
NT410
NT411
NT411