Owner's Manual
MT-42
[RS5F70A]
INPUT SHAFT AND GEARS
● Install 3rd & 4th coupling sleeve with its chamfered surface
facing the 4th input gear side.
4. Position bearing replacer to the front side of input shaft front
bearing.
● Align grooves of shifting insert and 3rd gear baulk ring. Then,
press it onto 3rd & 4th synchronizer hub assembly using a
drift.
5. Install 4th gear C-ring onto input shaft using Tool.
6. Measure the end play of 3rd & 4th synchronizer hub with a suit-
able tool, and check if it is within allowable specification.
7. If not within specification, adjust the end play by changing thick-
ness of 4th (input) gear C-ring. Refer to MT-61, "
Available C-
rings" .
8. Install 4th gear needle bearing, 4th gear baulk ring, and 5th gear
front C-ring.
9. Install 4th input gear using Tool.
SMT699D
SMT698DA
End play : 0 - 0.06 mm (0 - 0.0024 in)
SMT700D
SMT701DA