Owner's Manual

INPUT SHAFT AND GEARS
MT-45
[RS5F51A]
D
E
F
G
H
I
J
K
L
M
A
B
MT
Revision: March 2005 2005 Altima
Be careful with orientation of coupling sleeve.
Be sure not to hook ends of 2 spread springs (front and
back have two each) on same shifting insert.
13. Install 5th synchronizer hub assembly.
CAUTION:
Align grooves of 5th shifting insert and 5th baulk ring.
14. Install 5th stopper and then input shaft bearing spacer.
15. Install snap ring onto input shaft, and check that end play (gap
between snap ring and groove) of input shaft bearing spacer
satisfies standard.
If measurement is outside the standard range, select snap
ring.
SCIA0994E
SCIA1083E
Tool number : KV40105710 ( — )
WCIA0287E
Tool number : ST30032000 (J-26010-01)
WCIA0288E
End play standard value : 0 - 0.1 mm (0 - 0.004 in)
SCIA0930E