Owner's Manual

MAINSHAFT AND GEARS
MT-47
[RS5F51A]
D
E
F
G
H
I
J
K
L
M
A
B
MT
Revision: March 2005 2005 Altima
MAINSHAFT AND GEARS PFP:32241
Disassembly and Assembly ECS0094F
DISASSEMBLY
1. Before disassembling, measure end play of 1st and 2nd main
gears.
CAUTION:
If measurement is outside the standard range, disassemble
to check contact surfaces of gear, shaft, and hub. Adjust
with snap ring at assembly.
2. Remove the snap ring.
3. Remove C-ring holder, and then mainshaft C-ring.
4. Remove mainshaft rear bearing.
5. Remove the snap ring.
End play standard value
1st gear : 0.20 - 0.30 mm (0.0079 - 0.0118 in)
2nd gear : 0.06 - 0.16 mm (0.0024 - 0.0063 in)
SCIA0933E
SCIA0934E
Tool number A: Commercial service tool
B: Commercial service tool
C: ST33052000 ( — )
WCIA0291E
SCIA0936E