Owner's Manual

MAINSHAFT AND GEARS
MT-53
[RS5F51A]
D
E
F
G
H
I
J
K
L
M
A
B
MT
Revision: March 2005 2005 Altima
6. Install 2nd bushing.
7. Install outer baulk ring, synchronizer cone, and inner baulk ring
on 2nd gear-side.
8. Install 2nd needle bearing and 2nd gear.
9. Install 3rd main gear.
CAUTION:
Be careful with orientation of 3rd main gear.
10. Install 3rd-4th mainshaft spacer.
11. Select suitable adjusting shim so that dimension “C
1 ” satisfies
standard value below, and install it onto mainshaft.
Adjusting Shim
CAUTION:
Only one adjusting shim can be selected.
Tool number A: ST35321000 ( — )
B: KV40105710 ( — )
WCIA0297E
Tool number A: ST35321000 ( — )
B: KV40105710 ( — )
WCIA0298E
Standard for dimension “C1 : 173.85 - 173.95 mm
(6.844 - 6.848 in)
SCIA0944E
Thickness Part number Thickness Part number
0.52 mm (0.0205 in)
0.60 mm (0.0236 in)
0.68 mm (0.0268 in)
0.76 mm (0.0299 in)
32238 8H500
32238 8H501
32238 8H502
32238 8H503
0.84 mm (0.0331 in)
0.92 mm (0.0362 in)
1.00 mm (0.0394 in)
1.08 mm (0.0425 in)
32238 8H504
32238 8H505
32238 8H506
32238 8H507